Inspections OK
64%
14 of 22 actions
Failures by type
reading unreliable3
sensor timeout2
signal noise1
target not detected1
communication loss1
Anomalies by severity
CRITICAL2
HIGH2
MEDIUM2
Success by config here
V153% (9/17)
V2100% (5/5)
Where it is
WP09 marked on the two-floor map
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Assets
Every action here references an asset registered at this waypoint.
Registered here (assets.csv)
- PANEL-211 Electrical Panel 11 MEDIUM
- PANEL-212 Electrical Panel 12 HIGH
Inspected here (actions.csv)
- PANEL-212 Electrical Panel 12
- PANEL-211 Electrical Panel 11
Every action at WP09
22 actions across all missions, in kit time order
| Mission | Kit time | Asset | Inspection | Result | Reading | Anomaly |
|---|---|---|---|---|---|---|
| M001 | 09-01 18:12 | PANEL-212 Electrical Panel 12 | visual | OK | 83 score | |
| M002 | 09-02 02:18 | PANEL-211 Electrical Panel 11 | acoustic | reading unreliable | 66.6 dBquestionable | MEDIUM abnormal vibration |
| M004 | 09-02 18:24 | PANEL-211 Electrical Panel 11 | gauge reading | sensor timeout | 68.6 psiquestionable | MEDIUM gauge out of range |
| M005 | 09-03 02:07 | PANEL-212 Electrical Panel 12 | navigation | OK | 99 pct | |
| M006 | 09-03 10:31 | PANEL-211 Electrical Panel 11 | gauge reading | reading unreliable | 111.6 psiquestionable | CRITICAL gauge out of range |
| M007 | 09-03 18:24 | PANEL-212 Electrical Panel 12 | visual | OK | 83 score | |
| M009 | 09-04 10:22 | PANEL-212 Electrical Panel 12 | acoustic | signal noise | 81.5 dBquestionable | |
| M010 | 09-04 18:16 | PANEL-212 Electrical Panel 12 | thermal | OK | 63 C | |
| M013 | 09-05 18:09 | PANEL-211 Electrical Panel 11 | visual | OK | 85 score | |
| M013 | 09-05 18:19 | PANEL-211 Electrical Panel 11 | gauge reading | OK | none | |
| M014 | 09-06 02:05 | PANEL-212 Electrical Panel 12 | gauge reading | sensor timeout | none | HIGH gauge out of range |
| M014 | 09-06 02:20 | PANEL-212 Electrical Panel 12 | navigation | OK | none | |
| M016 | 09-06 18:26 | PANEL-212 Electrical Panel 12 | visual | reading unreliable | 74 scorequestionable | HIGH visual defect |
| M017 | 09-07 02:18 | PANEL-211 Electrical Panel 11 | visual | target not detected | 81 scorequestionable | |
| M017 | 09-07 02:27 | PANEL-212 Electrical Panel 12 | navigation | communication loss | 64.7 pctquestionable | CRITICAL navigation obstruction |
| M018 | 09-07 10:23 | PANEL-212 Electrical Panel 12 | gauge reading | OK | 86.4 psi | |
| M018 | 09-07 10:26 | PANEL-211 Electrical Panel 11 | visual | OK | 94 score | |
| M020 | 09-08 02:18 | PANEL-211 Electrical Panel 11 | acoustic | OK | none | |
| M021 | 09-08 10:22 | PANEL-211 Electrical Panel 11 | visual | OK | 77 score | |
| M023 | 09-09 02:08 | PANEL-211 Electrical Panel 11 | visual | OK | 90 score | |
| M025 | 09-09 18:09 | PANEL-212 Electrical Panel 12 | gauge reading | OK | 99 psi | |
| M026 | 09-10 02:18 | PANEL-211 Electrical Panel 11 | navigation | OK | 79 pct |