What happenedReported COMPLETED · actually Needs review
- Reported COMPLETED, but 3 of 10 inspections failed (target not detected, signal noise, communication loss).
- 1 serious anomaly needs review.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 10:02 | WP05 Pipe GalleryHeat Exchanger 01 | navigationSample image![]() | OK | 84.5 pct | 64% | |
| 2 | 10:05 | WP01 Main EntranceElectrical Panel 15 | acousticSample image![]() | OK | 70.7 dB | 60% | |
| 3 | 10:07 | WP15 Inspection DockHeat Exchanger 16 | gauge readingSample image![]() | OK | 99.7 psi | 55% | |
| 4 | 10:10 | WP06 Compressor AreaHeat Exchanger 17 | thermalSample image![]() | OK | 67.4 C | 51% | |
| 5 | 10:12 | WP11 Battery RoomHeat Exchanger 10 | visualSample image![]() | OK | 96 score | HIGH visual defect | 47% |
| 6 | 10:15 | WP05 Pipe GalleryHeat Exchanger 04 | visualSample image![]() | target not detected | 86 scorequestionable | 43% | |
| 7 | 10:17 | WP05 Pipe GalleryHeat Exchanger 02 | acousticSample image![]() | OK | 58.5 dB | 39% | |
| 8 | 10:20 | WP11 Battery RoomHeat Exchanger 10 | navigationSample image![]() | OK | none | 34% | |
| 9 | 10:22 | WP09 Turbine Hall SouthElectrical Panel 12 | acousticSample image![]() | signal noise | 81.5 dBquestionable | 30% | |
| 10 | 10:25 | WP02 Electrical RoomElectrical Panel 18 | navigationSample image![]() | communication loss | 55.6 pctquestionable | 26% |