What happenedReported COMPLETED · actually Degraded
- Reported COMPLETED, but 2 of 10 inspections failed (localization failure, target not detected).
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 18:03 | WP05 Pipe GalleryHeat Exchanger 01 | navigationSample image![]() | localization failure | 52.5 pctquestionable | LOW signal degradation | 67% |
| 2 | 18:06 | WP13 Warehouse CorridorHeat Exchanger 19 | gauge readingSample image![]() | OK | 102.8 psi | 62% | |
| 3 | 18:09 | WP09 Turbine Hall SouthElectrical Panel 11 | visualSample image![]() | OK | 85 score | 57% | |
| 4 | 18:12 | WP02 Electrical RoomHeat Exchanger 13 | visualSample image![]() | OK | 98 score | 52% | |
| 5 | 18:16 | WP01 Main EntranceElectrical Panel 15 | gauge readingSample image![]() | OK | 140.1 psi | 48% | |
| 6 | 18:19 | WP09 Turbine Hall SouthElectrical Panel 11 | gauge readingSample image![]() | OK | none | 43% | |
| 7 | 18:22 | WP05 Pipe GalleryHeat Exchanger 04 | thermalSample image![]() | target not detected | 76.1 Cquestionable | 38% | |
| 8 | 18:25 | WP12 Heat Exchanger AreaValve 07 | thermalSample image![]() | OK | 65.1 C | 33% | |
| 9 | 18:28 | WP07 Control Room CorridorHeat Exchanger 02 | acousticSample image![]() | OK | 81.9 dB | 28% | |
| 10 | 18:32 | WP13 Warehouse CorridorHeat Exchanger 13 | acousticSample image![]() | OK | 66.1 dB | 23% |




