What happenedReported COMPLETED · actually Needs review
- Reported COMPLETED, but 1 of 10 inspections failed (localization failure).
- 1 serious anomaly needs review.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 02:02 | WP05 Pipe GalleryHeat Exchanger 04 | navigationSample image![]() | localization failure | 53.7 pctquestionable | MEDIUM navigation obstruction | 84% |
| 2 | 02:04 | WP06 Compressor AreaHeat Exchanger 17 | navigationSample image![]() | OK | none | 83% | |
| 3 | 02:06 | WP11 Battery RoomHeat Exchanger 10 | thermalSample image![]() | OK | 43.8 C | 81% | |
| 4 | 02:08 | WP07 Control Room CorridorHeat Exchanger 04 | thermalSample image![]() | OK | 41.4 C | CRITICAL abnormal temperature | 80% |
| 5 | 02:10 | WP10 Valve StationPump 05 | thermalSample image![]() | OK | 72.5 C | 78% | |
| 6 | 02:12 | WP12 Heat Exchanger AreaValve 07 | thermalSample image![]() | OK | 70.8 C | 76% | |
| 7 | 02:14 | WP15 Inspection DockElectrical Panel 03 | acousticSample image![]() | OK | 77.5 dB | 75% | |
| 8 | 02:16 | WP07 Control Room CorridorPump 20 | navigationSample image![]() | OK | 91.7 pct | 73% | |
| 9 | 02:18 | WP09 Turbine Hall SouthElectrical Panel 11 | acousticSample image![]() | OK | none | 72% | |
| 10 | 02:20 | WP10 Valve StationPump 05 | acousticSample image![]() | OK | 64.8 dB | MEDIUM abnormal vibration | 70% |