What happenedReported COMPLETED · actually Degraded
- Reported COMPLETED, but 1 of 10 inspections failed (reading unreliable).
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 10:02 | WP05 Pipe GalleryHeat Exchanger 01 | navigationSample image![]() | OK | 88.3 pct | 95% | |
| 2 | 10:04 | WP05 Pipe GalleryElectrical Panel 03 | visualSample image![]() | OK | 79 score | 91% | |
| 3 | 10:06 | WP15 Inspection DockValve 07 | acousticSample image![]() | reading unreliable | 52.9 dBquestionable | 88% | |
| 4 | 10:08 | WP12 Heat Exchanger AreaValve 07 | gauge readingSample image![]() | OK | 108.2 psi | 85% | |
| 5 | 10:11 | WP10 Valve StationPump 05 | acousticSample image![]() | OK | 69.4 dB | 82% | |
| 6 | 10:13 | WP14 Auxiliary Systems BayPressure Gauge 09 | gauge readingSample image![]() | OK | 110.1 psi | 78% | |
| 7 | 10:15 | WP10 Valve StationPump 05 | thermalSample image![]() | OK | 64.7 C | 75% | |
| 8 | 10:17 | WP12 Heat Exchanger AreaElectrical Panel 18 | gauge readingSample image![]() | OK | none | 72% | |
| 9 | 10:19 | WP06 Compressor AreaHeat Exchanger 17 | acousticSample image![]() | OK | 65.8 dB | 68% | |
| 10 | 10:22 | WP09 Turbine Hall SouthElectrical Panel 11 | visualSample image![]() | OK | 77 score | 65% |




