What happenedReported COMPLETED · actually Clean
- Every inspection succeeded and no serious anomalies were found.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 10:03 | WP05 Pipe GalleryHeat Exchanger 02 | navigationSample image![]() | OK | 91.8 pct | 77% | |
| 2 | 10:06 | WP04 Pump BayCompressor 14 | navigationSample image![]() | OK | 85.6 pct | 71% | |
| 3 | 10:09 | WP08 Turbine Hall NorthHeat Exchanger 13 | acousticSample image![]() | OK | 65.9 dB | 66% | |
| 4 | 10:13 | WP05 Pipe GalleryHeat Exchanger 01 | gauge readingSample image![]() | OK | 132.5 psi | 60% | |
| 5 | 10:16 | WP05 Pipe GalleryHeat Exchanger 04 | visualSample image![]() | OK | 100 score | 55% | |
| 6 | 10:19 | WP15 Inspection DockHeat Exchanger 17 | thermalSample image![]() | OK | 65 C | 50% | |
| 7 | 10:23 | WP09 Turbine Hall SouthElectrical Panel 12 | gauge readingSample image![]() | OK | 86.4 psi | 44% | |
| 8 | 10:26 | WP09 Turbine Hall SouthElectrical Panel 11 | visualSample image![]() | OK | 94 score | 39% | |
| 9 | 10:29 | WP10 Valve StationPump 05 | navigationSample image![]() | OK | 88.7 pct | 33% | |
| 10 | 10:33 | WP14 Auxiliary Systems BayPump 20 | navigationSample image![]() | OK | 85.8 pct | 28% |




