What happenedReported COMPLETED · actually Degraded
- Reported COMPLETED, but 3 of 10 inspections failed (localization failure, reading unreliable, path blocked).
- Battery reached 14% at WP03. Across the kit, inspections below 20% battery succeed 27% of the time.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 18:03 | WP05 Pipe GalleryHeat Exchanger 02 | navigationSample image![]() | localization failure | 67.1 pctquestionable | 70% | |
| 2 | 18:06 | WP15 Inspection DockPump 20 | navigationSample image![]() | OK | 98.9 pct | 64% | |
| 3 | 18:09 | WP04 Pump BayCompressor 14 | acousticSample image![]() | reading unreliable | none | 57% | |
| 4 | 18:13 | WP04 Pump BayCompressor 14 | gauge readingSample image![]() | OK | 93.8 psi | 51% | |
| 5 | 18:16 | WP09 Turbine Hall SouthElectrical Panel 12 | thermalSample image![]() | OK | 63 C | 45% | |
| 6 | 18:19 | WP10 Valve StationPump 05 | visualSample image![]() | OK | 94 score | 39% | |
| 7 | 18:23 | WP12 Heat Exchanger AreaValve 07 | visualSample image![]() | OK | 82 score | 33% | |
| 8 | 18:26 | WP01 Main EntranceElectrical Panel 15 | thermalSample image![]() | OK | 53.9 C | 26% | |
| 9 | 18:29 | WP03 Cooling LoopHeat Exchanger 08 | navigationSample image![]() | path blocked | 37.5 pctquestionable | 20% | |
| 10 | 18:33 | WP03 Cooling LoopHeat Exchanger 08 | gauge readingSample image![]() | OK | 150.6 psi | 14% |