What happenedReported COMPLETED · actually Needs review
- Reported COMPLETED, but 3 of 10 inspections failed (sensor timeout, reading unreliable).
- 1 serious anomaly needs review.
- Battery reached 15% at WP09. Across the kit, inspections below 20% battery succeed 27% of the time.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 10:03 | WP05 Pipe GalleryHeat Exchanger 02 | navigationSample image![]() | OK | 91.6 pct | 67% | |
| 2 | 10:06 | WP05 Pipe GalleryElectrical Panel 03 | visualSample image![]() | OK | 82 score | 61% | |
| 3 | 10:09 | WP01 Main EntranceElectrical Panel 15 | navigationSample image![]() | OK | 80 pct | 56% | |
| 4 | 10:12 | WP03 Cooling LoopHeat Exchanger 08 | visualSample image![]() | OK | 72 score | 50% | |
| 5 | 10:15 | WP01 Main EntranceElectrical Panel 15 | acousticSample image![]() | sensor timeout | 67.7 dBquestionable | MEDIUM abnormal vibration | 44% |
| 6 | 10:18 | WP14 Auxiliary Systems BayPressure Gauge 09 | visualSample image![]() | OK | 72 score | 38% | |
| 7 | 10:21 | WP03 Cooling LoopHeat Exchanger 08 | visualSample image![]() | reading unreliable | 90 scorequestionable | MEDIUM visual defect | 32% |
| 8 | 10:24 | WP14 Auxiliary Systems BayPump 20 | visualSample image![]() | OK | none | 27% | |
| 9 | 10:27 | WP11 Battery RoomHeat Exchanger 10 | thermalSample image![]() | OK | none | 21% | |
| 10 | 10:31 | WP09 Turbine Hall SouthElectrical Panel 11 | gauge readingSample image![]() | reading unreliable | 111.6 psiquestionable | CRITICAL gauge out of range | 15% |