What happenedReported COMPLETED · actually Needs review
- Reported COMPLETED, but 3 of 10 inspections failed (reading unreliable, target not detected).
- 1 serious anomaly needs review.
- Battery reached 19% at WP09. Across the kit, inspections below 20% battery succeed 27% of the time.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 18:02 | WP05 Pipe GalleryHeat Exchanger 04 | navigationSample image![]() | OK | 87.1 pct | 70% | |
| 2 | 18:05 | WP11 Battery RoomHeat Exchanger 10 | visualSample image![]() | OK | 75 score | 65% | |
| 3 | 18:07 | WP01 Main EntranceElectrical Panel 15 | visualSample image![]() | OK | 87 score | 59% | |
| 4 | 18:10 | WP07 Control Room CorridorHeat Exchanger 19 | thermalSample image![]() | OK | 65.3 C | 53% | |
| 5 | 18:13 | WP01 Main EntranceElectrical Panel 15 | visualSample image![]() | OK | 87 score | 48% | |
| 6 | 18:15 | WP05 Pipe GalleryHeat Exchanger 02 | thermalSample image![]() | OK | 75.5 C | 42% | |
| 7 | 18:18 | WP06 Compressor AreaHeat Exchanger 17 | gauge readingSample image![]() | OK | none | 36% | |
| 8 | 18:20 | WP11 Battery RoomHeat Exchanger 10 | gauge readingSample image![]() | reading unreliable | none | 30% | |
| 9 | 18:23 | WP15 Inspection DockHeat Exchanger 16 | visualSample image![]() | target not detected | 82 scorequestionable | 25% | |
| 10 | 18:26 | WP09 Turbine Hall SouthElectrical Panel 12 | visualSample image![]() | reading unreliable | 74 scorequestionable | HIGH visual defect | 19% |