What happenedReported COMPLETED · actually Needs review
- Reported COMPLETED, but 3 of 10 inspections failed (sensor timeout, localization failure).
- 2 serious anomalies need review.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 02:02 | WP05 Pipe GalleryHeat Exchanger 02 | navigationSample image![]() | OK | 84.8 pct | 63% | |
| 2 | 02:05 | WP09 Turbine Hall SouthElectrical Panel 12 | gauge readingSample image![]() | sensor timeout | none | HIGH gauge out of range | 59% |
| 3 | 02:07 | WP06 Compressor AreaHeat Exchanger 17 | gauge readingSample image![]() | sensor timeout | 128.8 psiquestionable | HIGH gauge out of range | 54% |
| 4 | 02:10 | WP06 Compressor AreaHeat Exchanger 17 | navigationSample image![]() | localization failure | 48.8 pctquestionable | 50% | |
| 5 | 02:13 | WP13 Warehouse CorridorHeat Exchanger 13 | acousticSample image![]() | OK | 68.8 dB | 45% | |
| 6 | 02:15 | WP07 Control Room CorridorHeat Exchanger 04 | gauge readingSample image![]() | OK | 136.8 psi | 40% | |
| 7 | 02:18 | WP01 Main EntranceElectrical Panel 15 | visualSample image![]() | OK | 70 score | 36% | |
| 8 | 02:20 | WP09 Turbine Hall SouthElectrical Panel 12 | navigationSample image![]() | OK | none | 31% | |
| 9 | 02:23 | WP15 Inspection DockHeat Exchanger 02 | visualSample image![]() | OK | 83 score | 27% | |
| 10 | 02:26 | WP02 Electrical RoomElectrical Panel 15 | acousticSample image![]() | OK | 76 dB | 22% |