What happenedReported COMPLETED · actually Degraded
- Reported COMPLETED, but 3 of 10 inspections failed (sensor timeout, reading unreliable).
- Battery reached 13% at WP02. Across the kit, inspections below 20% battery succeed 27% of the time.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 10:02 | WP05 Pipe GalleryHeat Exchanger 04 | navigationSample image![]() | OK | 81 pct | 63% | |
| 2 | 10:05 | WP12 Heat Exchanger AreaValve 07 | visualSample image![]() | OK | 95 score | 58% | |
| 3 | 10:08 | WP04 Pump BayCompressor 14 | visualSample image![]() | OK | 79 score | 52% | |
| 4 | 10:10 | WP13 Warehouse CorridorHeat Exchanger 16 | thermalSample image![]() | OK | none | 47% | |
| 5 | 10:13 | WP08 Turbine Hall NorthHeat Exchanger 17 | acousticSample image![]() | OK | 71.1 dB | 41% | |
| 6 | 10:16 | WP08 Turbine Hall NorthPump 05 | visualSample image![]() | OK | 78 score | 35% | |
| 7 | 10:18 | WP06 Compressor AreaHeat Exchanger 17 | thermalSample image![]() | OK | 53.6 C | 30% | |
| 8 | 10:21 | WP15 Inspection DockElectrical Panel 18 | thermalSample image![]() | sensor timeout | 63 Cquestionable | MEDIUM abnormal temperature | 24% |
| 9 | 10:24 | WP08 Turbine Hall NorthElectrical Panel 15 | thermalSample image![]() | reading unreliable | 82.8 Cquestionable | MEDIUM abnormal temperature | 19% |
| 10 | 10:27 | WP02 Electrical RoomPressure Gauge 09 | thermalSample image![]() | reading unreliable | none | LOW abnormal temperature | 13% |




