What happenedReported COMPLETED · actually Degraded
- Reported COMPLETED, but 2 of 10 inspections failed (sensor timeout, reading unreliable).
- Battery reached 18% at WP15. Across the kit, inspections below 20% battery succeed 27% of the time.
Route
Blue line = this mission's path in action order
Color = share of inspections OK there (green ≥ 85%, yellow ≥ 70%, red below). Size = anomaly count. Dashed ring = outdoor leg (assumed).
Action timeline
Every inspection Spot attempted, with its reading and any anomaly
| # | Time | Where | Inspection | Result | Reading | Anomaly | Battery |
|---|---|---|---|---|---|---|---|
| 1 | 02:03 | WP05 Pipe GalleryElectrical Panel 03 | navigationSample image![]() | OK | none | 74% | |
| 2 | 02:06 | WP05 Pipe GalleryHeat Exchanger 02 | acousticSample image![]() | OK | 65.6 dB | 68% | |
| 3 | 02:09 | WP11 Battery RoomHeat Exchanger 10 | visualSample image![]() | OK | none | 61% | |
| 4 | 02:13 | WP01 Main EntranceElectrical Panel 15 | visualSample image![]() | OK | none | 55% | |
| 5 | 02:16 | WP14 Auxiliary Systems BayPump 20 | gauge readingSample image![]() | OK | 120.7 psi | 49% | |
| 6 | 02:19 | WP03 Cooling LoopHeat Exchanger 08 | navigationSample image![]() | OK | 81.8 pct | 43% | |
| 7 | 02:23 | WP04 Pump BayCompressor 14 | thermalSample image![]() | OK | 52.5 C | 37% | |
| 8 | 02:26 | WP04 Pump BayCompressor 14 | visualSample image![]() | OK | 84 score | 30% | |
| 9 | 02:29 | WP08 Turbine Hall NorthElectrical Panel 12 | gauge readingSample image![]() | sensor timeout | 140.8 psiquestionable | 24% | |
| 10 | 02:33 | WP15 Inspection DockElectrical Panel 18 | acousticSample image![]() | reading unreliable | 70.9 dBquestionable | 18% |




