Summary
- 26 of 27 rounds reported COMPLETED, but only 5 were clean.
- 15 anomalies need review, 4 critical; 0 triaged so far.
- Worst location: WP09 Turbine Hall South, 64% of inspections OK.
- Battery: below 20%, inspections succeed 27% of the time; V1 rounds drop as low as 12%.
- Next round Sat 6:00 PM ET: HOLD. Rain up to 7.2 mm/h before Spot can dock; Spot is rated for light rain and splashes only (IP54).
- Watch: Marine Weather Statement, Rip Current Statement.
Open anomalies (15)
| ID | Severity | Type | Asset | Location | Mission |
|---|---|---|---|---|---|
| AN030 | CRITICAL | navigation obstruction | Electrical Panel 12 (high) | Turbine Hall South | M017 |
| AN014 | CRITICAL | abnormal temperature | Heat Exchanger 04 (medium) | Control Room Corridor | M020 |
| AN020 | CRITICAL | signal degradation | Electrical Panel 03 (medium) | Pipe Gallery | M007 |
| AN038 | CRITICAL | gauge out of range | Electrical Panel 11 (medium) | Turbine Hall South | M006 |
| AN005 | HIGH | abnormal vibration | Heat Exchanger 02 (critical) | Electrical Room | M027 |
| AN002 | HIGH | gauge out of range | Heat Exchanger 17 (critical) | Compressor Area | M014 |
| AN025 | HIGH | localization issue | Heat Exchanger 17 (critical) | Compressor Area | M004 |
| AN003 | HIGH | visual defect | Electrical Panel 12 (high) | Turbine Hall South | M016 |
| AN037 | HIGH | abnormal vibration | Heat Exchanger 13 (high) | Control Room Corridor | M015 |
| AN035 | HIGH | gauge out of range | Electrical Panel 12 (high) | Turbine Hall South | M014 |
| AN007 | HIGH | abnormal vibration | Heat Exchanger 10 (medium) | Battery Room | M025 |
| AN028 | HIGH | abnormal vibration | Pump 05 (medium) | Valve Station | M024 |
| AN036 | HIGH | signal degradation | Electrical Panel 18 (medium) | Heat Exchanger Area | M022 |
| AN004 | HIGH | visual defect | Heat Exchanger 10 (medium) | Battery Room | M009 |
| AN009 | HIGH | visual defect | Heat Exchanger 08 (medium) | Cooling Loop | M001 |
Work orders (0)
None.
Handed over by to at